McMartin Preschool Case – Part two

http://ritualabuse.us/ritualabuse/articles/mcmartin-preschool-case-what-really-happened-and-the-coverup/

Chronology of the McMartin Preschool Abuse Trials

May 1983 Judy Johnson enrolls her 2 1/2-year-old son at the McMartin Preschool in Manhattan Beach, California.

June, July 1983 Judy takes her son to a pediatrician because he was complaining about his bottom hurting. The doctor has no specific diagnosis. The next time the child complained of having a lot of pain, she took him to a different doctor. Again the doctor had no explanation. In fairness there was virtually no information on the symptoms of sexual abuse of small children at that time.

August 12, 1983 Judy was shopping at a grocery store with her son in the cart when he complained again of severe pain. Judy checked his diaper and found blood.
She went to yet another respected local pediatrician and he diagnosed the boy as having been sodomized. The doctor, mandated to report cases of child sexual abuse, reports the case to authorities.

August 18, 1983 Judy Johnson meets with Detective Jane Hoag to be interviewed about her son’s symptoms for the investigation.

August 30, 1983 As requested, Johnson takes her son with her to the police station for another interview. He is 2 years and 8 months old. He names Ray Buckey.

September 9, 1983 Police Chief Harry Kuhlmeyer sends out a letter to 200 McMartin Preschool parents informing them that Ray Buckey is
suspected of child abuse and asking them for information. As other victims come forward, an unspecific list of suspected street blocks
and areas in town is circulated.

September 15, 1983 Ray Buckey is arrested on suspicion of child molestation but released soon after.

October 17, 1983 The District Attorney’s Office asks Kee MacFarlane, a consultant for the Children’s Institute International, to interview
child sex abuse victims who attended the school.

November 1983 Children’s Institute International interviewers begin diagnosing former students of the McMartin Preschool as having been sexually
abused. Dr. Astrid Heger does medical examinations with an innovative diagnostic tool called the culposcope. This microscopic examination technique allows slide pictures to be taken of minute scarring caused by penetration.

December 1983 One of the teachers, and defendant Babette Spitler, is promoted to director of the McMartin preschool in Peggy McMartin’s
place. Ms Spitler begs the parents to keep the children in the school and refer the school to others as well.

January 13, 1984. Virginia McMartin Preschool shut down after 28 years in business. The first McMartin Preschool located 1 mile west and this
second school were in operation totaling over 37 years. Virginia kept records on file cards of over 3,000 former and current students.

February 2, 1984 KABC reporter Wayne Satz shocks television viewers with reports of a massive child abuse scandal at the McMartin
Preschool.

February 1984 Seven defendants are arrested and charged with 207 counts of child molestation and conspiracy. Over 90 McMartin parents, file a civil suit against Virginia McMartin, Peggy Buckey, Betty Raidor, Babette Spitler, Peggy Ann Buckey and Ray Buckey for assault and battery and intentional infliction of emotional distress with one attorney. Others file suit with other attorneys. All suits are eventually dropped by civil attorneys after the 6 year statute of
limitations expired before the trial ended. Civil suits by families are never refiled.

March 11, 1984 A number of other daycare centers in the Los Angeles area are closed by the California State Department of Public Social
Services. Ten additional schools are closed in the South Bay area.
March 22, 1984 Teachers Peggy Buckey, Virginia McMartin, Ray Buckey, Peggy Ann Buckey (Ray’s sister), Mary Ann Jackson, Betty Raidor, and
Babette Spitler are indicted on 115 counts of child sexual abuse.

April 2, 1984 The L. A. Times reports that students at McMartin have been fondled, raped, drugged, photographed nude, forced to witness
animals being slaughtered and threatened to keep silent.

May 23, 1984 The prosecution files 93 new counts. The indictment count reaches 208, involving 40 alleged child victims.

Fall 1983 to March 1984 Nearly 400 children were interviewed at Children’s Institute International. Forty-one children are listed as victims in a
complaint filed by the State. The count of those diagnosed as sexually abused reaches 360 students. DA Robert Philibosian announces the 1976 Karen Klass murder case will be reexamined to determine if it could be linked to the McMartin case. Klass was the ex wife of Righteous Brother Bill Medley. She had been
murdered approximately an hour after leaving her 5 year old son at the pre school. Klass’ husband also died shortly after the McMartin
indictments in March 1984. His death was ruled an accident after he drove off a mountain road one afternoon in Oregon.

March 22, 1984, Los Angeles Grand Jury issues indictment charging 7 former teachers with 115 counts

April 7, 1984 Bail revoked for 5 defendants who had been free on bail when 400 additional sex acts are presented.

May 1984 Arsonist attempts to burn down the empty cinder block preschool building, causing over $10,000 in damage. The room where
children identified the entrance to the tunnels, the “C” Charlie room was most badly destroyed. The classrooms are repainted, new furniture
is built and trees trimmed in time for the jury to tour the site.

May 24, 1984 An additional 92 counts of child molestation are filed against all 7 defendants. A charge of conspiracy to commit lewd and
lascivious acts by force or threat of force on a child under 14. Count is now 207 against 42 children.

June 8, 1984 Preliminary hearing begins.

June 1984 Bail for Peggy Buckey is set at $1 million; Ray Buckey continues to be held without bail.

July 12, 1984 A Federal Grand Jury is impaneled to begin its own investigation of the case.

August 8, 1984 Prosecutor Lael Rubin announces that the seven McMartin teachers committed 397 sexual crimes, in addition to the 115 for which
they already faced charges.

August 17, 1984 Preliminary hearing begins. The pretrial begins with Judge Aviva Bobb and prosecutors Lael Rubin, Glenn Stevens and
Christine Johnston.

October 26, 1984 Judge Aviva Bobb consolidates hearing for Buckey and six others. There are 7 defense attorneys one for each of the 7 defendants. Any objection by defense can be (and are) repeated 7 times. Each objectionhas to be argued separately, enormously extending courtroom time used
by the defense.

November 1, 1984 Sheriff Sherman Block announces that the Sheriff’s Department will enter into the investigation and be responsible for
allegations in relation to the operation of the McMartin preschool which are not part of the current court case. The number of “Uncharged
suspects” is estimated at 85+.

January 7, 1985 Doctor Astrid Heger testifies that she found physical evidence of sexual assaults on 33 of the child witnesses.

March 1985 A group of nearly 50 McMartin Preschool parents arrive at the lot adjacent to the school formerly used as a play yard for the
school and begin searching for the tunnels many of the children talked about. A dead turtle is found with roots growing up through its
shell. The District Attorney is called immediately. A few days later, an archeological firm, SRS, hired by the District Attorney’s Office begins its own dig. Using the Geonics EM31Terrain Conductivity meter, the side lot is searched no more than 6 inches in depth. The team never entered the preschool building. Several turtles and other animal remains were found.

March 6, 1985 Judy Johnson was put on 72 hour watch at a hospital. She is released with no diagnosis of any mental disorder.

April 29, 1985 An increasing number of suspected perpetrators have been probed by detectives since September of 1984. Fifty additional
individuals are placed under investigation. A special elite task force consisting of 21 detectives and prosecutors is formed by the Los
Angeles County Sheriff’s Department by Chief Sherman Block and headed by Lieutenant Richard Wiley to look at these and other “uncharged
suspects. Investigations of 5 preschools in the area are not expected to produce any arrests for over a year. “Under the current legal system, we cannot file criminal actions because of their age and inability to qualify in a court system,” states Wiley.

May 18, 1985 Governor signs SB46 giving judges the discretion to use closed circuit testimony for child victims of sexual abuse. This law
years later passes the Supreme Court and becomes national law.

June 11, 1985 Judge Bobb rules that child witnesses will not be allowed to use the new statute allowing child victims of abuse to
testify over closed circuit TV. The prosecution immediately announced that it would not call any of its remaining witnesses. Only 5 of those
28 were willing to testify at all and then only by way of closed circuit TV. Six other witnesses dropped out because Rubin said they
could not withstand even the protective TV procedure. The remaining 16 witnesses had been withdrawn by their parents after they saw the
effects of lengthy cross-examination on the early witnesses. This reduces the number of witnesses from 43 to 13 and, as a result,
the reduces the number of counts.

June 14, 1985 Prosecutors add an additional 50 counts raising the number to 241 counts.

January 1986 Prosecutor Glenn Stevens is ordered to hand in his resignation form the District Attorney’s office after he is caught lying to his superiors about leaking information to the media.

January 9, 1986 Judge Aviva Bobb orders all 7 defendants held over to Superior Court trial with 135 counts of molestation and conspiracy. Thirteen of
the 41 child original witnesses remain. The cost of the 18 month hearing was estimated at $4 Million. The indictment had been 115 counts. Ultimately 20 counts were added.

January 17, 1986 Before the case is assigned to a trial judge and after loosing 28 witnesses because of brutal defense tactics during
the pretrial weakened the case, District Attorney Ira Reiner decides to drop charges against five of the seven defendants. Reiner tells
parents that Betty Raidor has enough remaining counts to face trial, but says he thinks she would not fit in prosecuting mother and son,
Peggy and Ray Buckey. The two are prosecuted on 79 counts and 20 counts, respectively, of child sexual abuse.

January 23, 1986 Peggy Buckey is released on $295,000 bail after bail is reduced from $495,000.

August 1986 Former prosecutor Glenn Stevens contracts with screenwriter Abby Mann to do a book and a movie in which he would be
portrayed as an ambitious attorney whose conscious got the better of him. Voluminous transcripts of Steven’s taped interviews at Mann’s
Beverly Hills Mansion were transcribed. Stevens accuses Rubin of being a liar and DA Philibosian of playing up the publicity. Mann goes to
the defense and asks to be hired as an investigator so the information can be included in the trial. The trial stops while these allegations
are reviewed. Stevens also jokes about Judy’s dog being sodomized and says she is a “banana boat.” Judy was never diagnosed with any mental illness
despite having been on a 72 hour watch at UCLA County Hospital. Eventually, Mann produces the information he gathers from the McMartins and defense attorneys into the movie `Indictment.’

December 19, 1986 Judy Johnson is found dead at 2:45 PM in her Manhattan Beach house by police after concerned neighbors called. Judy
died before having a chance to testify at the trial

April 20, 1987 Jury selection for the Superior court trial begins. Ray Buckey and his mother Peggy face 100 counts. Ninety-nine counts of child
molestation and 1 count of conspiracy.

January 13, 1987 Opening statements begin.

July 29, 1987 First parent testifies.

August 1987 The first victim witness, a girl now age 12, takes the stand as a witness for the prosecution.

October 12, 1987 Judge Pounders dismisses 27 of the 100 counts. Some parents, again refuse to let their children testify under adverse conditions.

December 10, 1987 Retired former police investigator Paul Bynum is called to testify at the trial by prosecutor Lael Rubin. The morning he was to appear, a juror’s home was burglarized and Bynum’s testimony was rescheduled for the next morning. Bynum was found dead by his wife at 5:45 that morning, shot in the head by a .38 caliber pistol. Bynum had conducted the first search for evidence at the preschool site in 1984 at the request of Ray Buckey. “None of the half dozen people questioned who were close to Bynum could think of any reason why his involvement in the case might have driven him to suicide,” reported Kevin Cody of the Easy Reader in Manhattan Beach. “Paul was kind of a worrier,” said Stephen Kay, a deputy district attorney and friend of the Bynum family, “but there was no hint of suicide. He was very upbeat about his wife and new daughter, both of whom he adored.”

October 19, 1988 The defense opens its case after 61 witnesses have finished testifying for the prosecution.

December 1988 Paul and Shirley Eberle, prolific pornographers of the 1970s (Finger magazine) and editors of the pornographic tabloid, LA Star, publish The
Abuse of Innocence, their version of the trial thus far.

February 15, 1989 Ray Buckey is released from jail on $1.5 million bond.

February 1989 Ray Buckey is released on bail after spending five years in jail.

May 16, 1989 Peggy Buckey takes the stand in her own defense and vigorously denies all allegations.

July 26, 1989 Ray Buckey takes the stand and denies he molested children.

July 27, 1989 Danny Davis, Ray Buckey’s attorney tops the list as the highest paid court appointed attorney at $509,340.00 for the 1986-87 fiscal year.

November 2, 1990, Jurors begin deliberations.

January 18, 1990 The jury returns its verdict in the first McMartin trial. Peggy and Ray Buckey are acquitted on 52 counts. The jury deadlocks on 13 counts, all against Ray Buckey. The jurors are polled and say they believe molestation took place at the preschool but that the prosecution did not prove the case. The expressed disappointment at not hearing more from the children.

January (late) 1990 District Attorney Reiner announces that he will retry Ray Buckey on eight of the 13 counts involving three girls.

February 5, 1990 Deputy District Attorneys Joe Martinez and Pam Ferraro are assigned to the case. Incredibly, after the trial, it is discovered that Pam Ferraro was a former student of the McMartin Preschool. Photographs of her sitting on Peggy Buckey’s lap reading a book, sitting at a table with Peggy, Virginia and several of other students as well as a McMartin preschool class picture including Peggy and Virginia.

April May, 1990 Tunnels are found under the foundation of the McMartin preschool building by a team of Archaeologists headed by Dr. Gary Stickel. Ground Penetrating Radar recently developed by the U.S. Army is used to define the location of anomalies under ground. Three segments of tunnel, one over 45 feet in length with a 9′ x 9′ room area are found exactly where the children said they were. District Attorney does not use the evidence because of time and money
constraints and the fact that they would have to start a new investigation of their own at the site as they did in 1985. The discoveries are widely reported in the news.

May 30, 1990 With the entire team of archaeologists, geologists still uncovering evidence of filled in tunnels, the McMartin Preschool is demolished by a bulldozer ordered by the new owner, developer, Arnold Goldstein. Final cost of the archaeological project, paid for by parents and donations, exceeds $53,000.

June 8, 1990, 83 year old Virginia McMartin takes the stand at her grandson’s retrial and after only 10 minutes and several outbursts in front of the jury, testimony is halted. A year earlier when she testified in front of Judge Pounders her testimony ended in the same outrageous manner. Judge Pounders had threatened to have her jailed, but later declared her medically infirm.

July 2-3 1990 Lawyers present closing arguments.

July 27, 1990 On their 15th day of deliberations, the jury tells the judge they are hopelessly deadlocked on all 8 counts. The judge declares a mistrial.
Juror L. I., a 64 year old treasury department employee said , “I don’t know how you could get 12 people to be unanimous in this case. There are too many unanswered questions. Too much time has passed.” Again because of money and time constraints, DA Ira Reiner decides not to ask for a third trial of Ray Buckey. The first two prosecutions have consumed over $15 million and seven years of court time. He is under tremendous political pressure because he has failed in prosecuting the case.

May 1991 Parent is ordered to pay one dollar each to McMartin defendants after they sue him for defamation of character. They had asked for $500,000 each.

1995 Virginia McMartin dies at age 88. HBO shows a docudrama, “The Indictment,” written by McMartin sympathizer Abby Mann and starring
James Wood. The McMartins are paid over $75.000 each for their version of the story. Mann wins an award for his work. Oliver Stone had
originally backed the project but minimized his involvement after public outrage. By 2000, Betty Raidor and Peggy McMartin Buckey die also.

1996 Single mother Jackie M. who saw the archaeological investigation of the school site to its conclusion commissions the archaeologist,
Dr. E. Gary Stickel to write a formal report. All other professionals involved cooperate in gathering facts and assisting Dr. Stickel in composing a formal report.

1998 Formal report of the Archaeological Investigation at the McMartin Preschool is completed at the cost of $3,000. Jackie and the archaeologist present the findings at the APSAC (American Professional Society Against Abuse of Children), Children’s Hospital Conference in San Diego, California

Archaeological Investigations of the McMartin Preschool Site (http://web.archive.org/web/20010406130849/http://members.cruzio.com/~ratf/McMartIntro.html)

Introduction by Santa Cruz Ritual Abuse Task Force

Have you heard of the McMartin case? Most people know something about the story. In 1983, hundreds of kids disclosed to their parents and therapists that they were abused at the prestigious McMartin Preschool in Manhattan Beach, California. Seven people were arrest and charged with hundreds of counts of child sexual abuse, setting off the longest and most expensive trial in U.S. History (7 years-$20,000).

The defense claimed that the kids hadn’t really been abused, but that their memories were implanted by a conspiracy of witchhunting therapists. It was a successful tactic and all of the accused were let go.

Well, the kids memories weren’t implanted. Many of the kids consistently talked about tunnels under the pre-school where they were taken, sexually abused, and witnessed terrifying events such as animals being killed. The defense called these accusations “bizarre” and claimed they were proof that the children were wrong.

But the truth is that the tunnels are there. In fact they are more than just there. The tunnels are extensive, include a large room just as the children said, and lead to further sites off the property. The tunnels were found in an archeological dig under the pre-school conducted by Dr. E. Gary Stickel, archaeologist and director of Environmental Research Archaeologists, a Scientific Consortium.

You probably haven’t heard of these tunnels. Debbie Nathan, a journalist who made her career by ridiculing evidence of ritual abuse, ignored the archeological investigation entirely in her in her book Satan’s Silence which talked extensively about the McMartin case. HBO’s television movie Indictment: The McMartin Trial portrays the entire community as hysterical with no mention that the tunnels were found. The False Memory Syndrome Foundation Newsletter has claimed outright that no tunnels were ever uncovered, even though members of the board of directors have copies of the full report.

So here it is, the summary of the Archeological Investigation of the McMartin Pre-School Site. The full report is currently looking for a publisher. If you are interested in publishing this work, please contact the task force.

Archaeological Investigations of the McMartin Preschool Site, Manhattan Beach, California

(http://web.archive.org/web/20010123212200/members.cruzio.com/~ratf/McMartin.html/)

Executive Summary

During the month of May 1990 an archaeological project was conducted at the McMartin Preschool site to determine, once and for all, whether or not there had ever been tunnels under the building, as described by various children. Excavation was carried out according to established scientific conventions with a careful research design defining what might prove or disprove the existence of “an underground feature that would connect to the surface of the site and extend underground for some distance. ” [with] dimensions large enough to accommodate adult human movement through it”. (p. 24)

The project unearthed not one but two tunnel complexes as well as previously unrecognized structural features which defied logical explanation. Both tunnel complexes conformed to locations and functional descriptions established by children’s reports. One had been described as providing undetected access to an adjacent building on the east. The other provided outside access under the west wall of the building and contained within it an enlarged, cavernous artifact corresponding to children’s descriptions of a “secret room”.

Both the contour signature of the walls and the nature of recovered artifacts indicated that the tunnels had been dug by hand under the concrete slab floor after the construction of the building. Whatever the purpose of this elaborate enterprise, even more effort must have been devoted to filling the tunnels back in and trying to conceal any evidence of their existence. Much of the fill dirt used for packing the tunnel spaces was mixed with historic debris, as if to mimic the surrounding terrain.

Not only did the discovered features fulfill the research prequalifications as tunnels designed for human traffic, there was also no alternative or natural explanation for the presence of such features.

Background

The McMartin preschool in Manhattan Beach, California was the first of what has since been described as a national epidemic of multi-victim, multi-perpetrator accusations of sexual and sadistic abuse which erupted in the mid 1980’s. The McMartin case was encumbered with hundreds of charges against seven defendants and dozens of uncharged suspects. It became the longest, most expensive and arguably most controversial criminal trial in American history. The descriptions given by children to investigators and parents were unusual and unprecedented as they emerged in 1983, but they became so stereotypic to subsequent cases throughout the country as to become generic of presumed “ritual abuse”. Accusations of such extreme cruelty and bizarre perversity in the absence of physical evidence or obviously deranged suspects led eventually to increasing skepticism that such crimes could possibly exist. Simple alternative explanations emerged, first as criminal defense theories and then as common wisdom: very young children were moved by the hysterical overreaction of various adults to make unfounded accusations. Full-page newspaper ads placed in 1984 by McMartin criminal defense attorneys raised the specter of the Salem witch trials. The witch hunt analogy has since flourished to create substantial public distrust of preschool-age witnesses and of the adults who question them.

The failure of prosecutors to obtain even a single conviction in the McMartin trial has been taken by many as proof that the children’s allegations were merely fantastic. Various journalists have demanded punishment of the professionals and parents who had chosen to believe them. Similar allegations arising more recently in other cases in the United States and abroad are tested against the McMartin standard, creating a prejudice against investigating or substantiating even remotely “bizarre” complaints. Parents in such cases feel triply betrayed: first with the dreadful discovery of abuse; second with their abandonment by law enforcement, and third with being blamed for imagining the abuse and fomenting public hysteria.

One of the supposedly bizarre aspects of the McMartin case was the children’s insistence that they were taken into underground tunnels. They explained that the tunnels led to an underground “secret room” where abuse occurred, as well as providing a route for subversive transport to off-site locations for sexual exploitation. These stories were apparently considered fantastic by investigators, who made no attempt to search beneath the building.

A group of parents forced the hand of the district attorney on March 17, 1985 by initiating an excavation in the adjacent lot. The district attorney then authorized an archaeological inspection of that lot by Scientific Resource Surveys Inc. (SRS). There was no exploration beneath the slab floor. Instrumental survey with a terrain conductivity meter failed to detect alterations under the concrete. The SRS technician informed the district attorney’s investigator that the meter proved useless within the structure because of excessive interference from pipes and steel reinforcement. The preemptory conclusion at that time that there were no tunnels has become gospel among detractors of the McMartin families. Influential journalists ridicule parents for ever entertaining such a possibility and mock their subsequent attempts at exploration.

The first opportunity for private exploration came in April 1990 when the property was sold. Several parents obtained permission from the new owner to search for the tunnels. After cutting out a section of concrete and coming up with ambiguous findings, it became apparent that experienced supervision was needed. Gerald Hobbs, a professional miner, was engaged to insure safety and to better define the nature of the underground artifacts. When an apparent tunnel entrance was discovered and then verified by geologist Dr. E. Don Michael, parents sought out the archaeological team that completed the present project.

Method

The project was designed and conducted by E. Gary Stickel, Ph.D., on the recommendation of Rainer Berger, Ph.D., Professor and Chair of the Interdisciplinary ?Program of the Archaeology Department at UCLA. Dr. Stickel is director of Environmental Research Archaeologists, a Scientific Consortium(ERA).

Several areas of the preschool site were designated and mapped as units for scientific excavation. These were selected according to differing criteria: re-exploration of sites documented in the district attorney’s SRS survey, children’s reports of entrance locations, anomalies detected through instrumental survey by ground penetrating radar (GPR), and the sites of significant discovery under Mr. Hobbs’ supervision.

Hypotheses and Test Expectations

The primary research problem was to determine whether or not there were a tunnel(s) and an underground room(s) at the site in question. To meet the test hypotheses, a tunnel would be an underground feature that would connect to the surface of the site and extend underground for some distance, possibly (but not necessarily) connecting to an underground room(s). It would have to have dimensions large enough to accommodate adult human movement through it. Such a tunnel on the subject property could have been constructed in two ways: 1) either dug out as a trench-like opening which would then be roofed over with wood and/or other materials and covered over with fill above to make a true tunnel (as opposed to an open trench), or 2) would be dug out completely underground, which would then leave a “ceiling” over its passageway formed of the naturally deposited soil. If the latter were the case, such a tunnel may or may not have been fitted with an underground “roof” of wood and/or other materials either to reinforce the strength of the “ceiling” of the tunnel or to keep loose soil and dust from falling down on people using it. In either scenario (l or 2) such a tunnel may have had posts of wood and/or other materials (e.g. iron) to serve as shoring reinforcements.

Thus, given the operational definition of a tunnel considered here, the following hypothesis and test expectations were considered (test expectations are specific, tangible data that are to be expected and are discoverable if the hypothesis is valid; Stickel, 1979).

If a tunnel(s) were present at the McMartin Preschool site, then the following test expectations should be present:

1. An opening(s) (entrance and/or exit) large enough for human passage should be present permitting access from the surface down into a tunnel feature.

2. Tunnel architecture should be linear or curvilinear (i.e. an elongated passageway leading in a definable direction(s).

3. Tunnel architecture (especially depth or height and width) should be large enough to accommodate adult human passage.

4. The walls and/or uncovered soil ceiling of the tunnel should have “signatures” of markings indicating whether the tunnel had been dug by hand and/or by a machine (e.g. a backhoe).

5. There should be a compacted dirt floor (compacted by human foot traffic) distinguishable from surrounding non-tunnel soil which should not be compacted.

6. The tunnel could be open (i.e. traversable and unfilled).

7. The tunnel may be naturally (i.e. natural processes of erosion and soil redeposition) or artificially (by human action) filled in with soil. Such fill should be distinguishable from the natural soil matrix of the site in terms of color and/or by texture, and compaction (i.e. would be less compact than the soil forming the tunnel’s walls, floor and ceiling).

8. The tunnel fill may have inclusions of:

1. Natural stones and/or other natural items or;

2. Artifacts and/or ecofacts.

9. Although a tunnel of the type sought in this project may not be directly datable (e.g. in contrast to a construction date molded into the concrete of a railroad tunnel), the tunnel may be dated indirectly by the dates on artifacts contained within it if any are present.

The test expectations for a subterranean room would be essentially the same as for a tunnel. The exception would be for test expectations 1, 2 and 3 above which would be modified to reflect necessary doorway(s) into a room, that the shape of the room would not be too linear (as a tunnel) but would be “room shaped”, i.e. square, round, or ovoid, and that a room would be of sufficient dimensions (length, width and height) to be distinguishable from a tunnel passageway. A room would thus be of sufficient size to accommodate a number of people interacting in a face-to-face manner as opposed to a tunnel which (depending on its size) would provide restricted possibilities for human interaction. Since, on balance, one would expect human usage of a room to be more prolonged than in a tunnel passageway, artifacts catering to prolonged usage would be expected in such a room, perhaps in the form of chairs, couches, tables, a lighting system, etc. These expectations were borne in mind during our search of the site.

Initial surveys would be conducted with remote sensing instrumentation. The author’s experience elsewhere predicted that Ground Penetrating Radar, rather than the terrain conductivity meter used in the previous survey, would be effective for anomalies beneath a concrete slab floor.

Findings

The profile of an entrance/exit tunnel was discovered under the foundation of the west wall of the building (Classroom #4, see map, p. 13, this summary). The signature of this feature was described and sketched by consulting geologist Don Michael, Ph.D. (p. 113). The feature was clearly distinguished by loose, disturbed soil and the artifacts contained within it. The outside margins had an inverted bell-shaped curve profile. The tunnel signature was established both by the sharp demarcation of soil color and texture, as well as by the exclusive presence within the cavity fill of assorted historic debris such as old cans and bottles, various metal fragments and small household items. The roof at that point was provided by the bottom of the concrete foundation. Inside the foundation a roof of soil was evident.

The profile was also demarcated by severed tree roots, the significance of which was described by professional tree surgeon Jerry Hobbs:

…running under the foundation from south to north was a large root which had been chopped off at the edge of where the large amount of cans, bottles, and plastic were being found. A growing root would have had to run in and through the cans and bottles but did not. The root, some 3″ in diameter had been severed with a hand saw about 90% through, then pulled off, peeling the bark of the root. The peeled layer of the cambium layer had well established healing already in progress. New feeder roots had started to grow from the cut portion of the root, and attained lengths of 6″ to 15″. A space of 59″ to the north the roots pick up again, only these had been chopped off from the larger root and were dead. [The dead root] was about 1″ in diameter and continued in the same 30 degree angle as the other root, the cambium layer was separating from the rest of the woody part of the root, indication it was probably severed at the same time the green root that was attached to the tree was severed. Both the feeder root lengths and the healing of the cambium layer indicate that the root had been cut at a time of 4 to 6 years earlier. I feel my determination is accurate due to my experience of the planting and removal and care of some of the same kind of trees for more than 25 years. To me this is conclusive that with the inconsistent soil area, the plastic bag dated 1982 [see next paragraph] and the old bottles, cans and debris, were put in the ground after 1982, and it was not an old dump area as it appeared. (Appendix III, pp. 174-176)

A plastic sandwich bag was found under the foundation at a depth of 42″ below the surface and 3-6″ inside the wall line of the building. The bag was imprinted with Disney characters and the words: “?1982 Walt Disney Productions”, along with a logo of a school house with “Disney Class of 1982/1983″ underneath. These factors led Dr. Michael to conclude “therefore, the cavity could be no older than 1983″ (p. 84).

Due to the crucial location and dating of the Disney bag as evidence of recent disturbance, alternate hypotheses were examined. Could the bag have been artifactual not of a clandestine, buried tunnel but rather incidental to the parents’ March 1985 dig or to the subsequent SRS excavation commissioned by the district attorney? After careful analysis of the parameters of each excavation, Mr. Langenwalter, senior author of the SRS study, concluded that since the parents’ backhoe trench was no less than 137″ from the northwest corner, it is clear that the plastic Disney bag was located by Hobbs in the virgin area between the SRS excavation and the parents’ dig. In fact, it was recovered 7″ south of the parameters of the SRS excavation and approximately 13″ north of the parents’ backhoe trench (p.184).

The emphatic correlation of definitive observations for this tunnel entrance feature is especially significant in view of its location: the decision was made to explore this precise area because some of the children had stated that there had been animal cages placed along the wall and they had entered a tunnel under the cages at that point (cf. Langenwalter, et al, 1985: 13).

Excavations where conducted in the westernmost sector of Unit 1 in room #3. This site was selected because a GPR anomaly was detected through the concrete floor in an area next to and continuing up against the west dividing wall between classrooms #3 & #4. Several human-introduced artifacts were encountered adjacent to a 3 inch cast iron waste pipe running northward from the dig. The size of the artifacts ruled out their introduction by burrowing rodents (bioturbation) and their distribution was confined within a shallow, trench-like profile of different colored soil. This proved to be a mechanically dug trench to accommodate the waste pipe from the bathroom in classroom #3, as substantiated also by the signature characteristic of a backhoe. However, one aspect of the pipe and trench complex was uncharacteristic and unexplainable at the time of excavation: the stainless steel clamps connecting an angle of the waste pipe. These two clamps were notable in that they appeared to be brand new, with a very shiny silver color, lacking the patina expected of objects buried long underground. That apparent disparity of age or use became more apparent as other clamps were unearthed elsewhere, all of which were considerably etched and discolored. There was no opening through the concrete floor which could have allowed for access to these clamps after the floor was poured, and there was no explanation for their like-new appearance if they had remained buried for the life of the structure.

A possible tunnel feature was excavated from the toilet areas in classroom #1 and the office. This feature was distinguished clearly by the color and compaction of the interior soil, which was much darker and more loosely compacted. The feature appeared to connect the area beneath the office and classroom #1 and to proceed eastward toward the eastern, outer wall of the preschool. Mr. Hobbs made a number of ancillary observations, summarized as follows:

The children stated that they had entered a tunnel from the south east corner of room 1. We dug down along the east wall of room one and the bathroom. As we followed the disturbed area south, it went under the wall into the now existing bathroom, after about 6 feet it made an abrupt right turn to the east and headed for the neighboring property. The children had told two different stories about this tunnel prior to the dig. One, that they had gone through the tunnel and come up in the house next door and two, they had come up in the garage, which blocked the house from the street. At any rate the tunnel went in that direction. I went to the house next door and followed the walk between the school and the house which were only about 4′ apart. I went under the house and bellied my way toward the southwest corner of the house. After going about 20′ I found an area inside the west wall of the house where the floor was cut out. If I remember correctly the area of the floor that was missing was 36″ by 38″ or 41″, you could reach up and touch the bath tub which was exposed. The plumbing in that area appeared to be quite new.

I went back to the school and continued to dig. The tunnel I had been following was now headed toward the corner of the house where I had found the hole cut in the floor. I was very close to the foundation of the house, I was sure, so I poked a hole up through to the surface. The hole I punched through was about 2′ beyond the west wall of the house and about 1′ outside the south wall of the house. This tunnel was in direct line with the cut out opening under the house.

In addition to the difference in soil composition, the tunnel feature was distinctive from the surrounding matrix and from some other tunnel features discovered later, in that it had been back filled with earth that contained virtually no large artifacts or ecofacts. It did contain numerous flecks of charcoal and carbon and pieces of plaster with green paint, which the excavators hypothesized might be the remnants of the green paint that had been applied to the school in 1984 or 1985 and possibly of the fire that had occurred within the building on April 8, 1984. The maximum depth of the feature was 6 feet, and its excavated length was over 26 feet. The feature fulfilled 4 of the 5 test expectations as a tunnel, lacking only a well defined roof contour.

Several units for study were established in the adjacent vacant property (sidelot) and in the play yard adjacent to the school building, in reference to both the prior archaeological project and anomalies detected by GPR. These digs turned up apparently irrelevant artifacts such as the cesspool of the earlier residence on the sidelot and some irregular chunks and slabs of concrete. A more surprising finding was the absence of toys or other playthings that would be expected from the use of the excavated area of the preschool play yard as a children’s sand box. The only exception was a 3 inch plastic plate bearing three hand-drawn five-pointed stars of differing sizes. These stars were drawn by an adult with a careful and deliberate style inconsistent with childrens drawings.

The most definitive discoveries came to light through following the vein of artifactual debris from the tunnel portal under the west wall of Classroom #4. An apparent tunnel signature veered southward once inside the foundation. The width and direction were clearly indicated not only by the abundance of historic artifacts contained within it, but also the soil color of the fill matrix was distinctly darker than the surrounding natural soil. The average width of the tunnel feature was greater than 4 feet as it extended on the diagonal completely across Unit 1 and under the concrete floor to the western edge of Unit One.

Proceeding southward, the tunnel feature widened at one point to the extent that it appeared less tunnel-like and more like a room. Also at that point a layer of plywood roofing material along with tar paper and roofing nails was found at the top of the tunnel fill material. Underneath the plywood and tar paper was a continuing abundance of bottles, wood and other debris. It became obvious that this densely packed debris-filled area was quite large in relation to the tunnel passage previously described. This room-like feature extended southward to the area under the doorway to Classroom #4 and the sidewalk corridor beyond.

It was observed that the layer of plywood and tar paper, which may have served as a kind of roof for the room-like portion of the feature, continued in an arc to the east across the east side of the southeast corner of trench Unit 1. There were obvious soil color and density demarcation lines at the roof, floor and sides. The overburden of soil forming. The existing roof of the tunnel at that point was 22 inches thick (measuring from between the bottom of the concrete floor and the demarcation of the former tunnel cavity). The walls of this wider area bore shovel mark “scars”. These “scars” indicated that the tunnel had been dug out with hand tools rather than mechanized equipment.

The depth of the tunnel in the room-like area was a little more than 6′8″, which would have permitted most adult males to stand upright. In contrast, the depth of the tunnel in the passageway leading up to the room-like feature was more shallow, at an average of 5′11″, which would have required most adult males to bend over when walking through the passageway.

A major artifact was found buried within the room-like feature: an intact rural, roadside style mailbox. This mailbox had the name and address of the last occupants of the house that stood on the adjacent lot until it was torn down in 1972.

The tunnel direction changed dramatically beyond the room-like area, turning to a “dogleg” headed acutely eastward. A crucial dilemma was imminent at this point. With only two days left to complete all excavation, there was not time to both explore the full dimensions of the possible room and to follow the ultimate extent of the tunnel. Although important data may well have been missed by not fully exploring the “room”, it was considered more important at that time to redirect full effort to explore the tunnel. It was hoped that the more the tunnel feature could be defined, the more possibilities there would be for making correlations with the eyewitness reports of the children.

In digging out the tunnel fill eastward under the concrete floor, it became apparent that the line of the tunnel continued across Classroom #4 and into the cut through the floor at Unit 1. The width of the tunnel was still about 3 feet. The height of the tunnel feature was unlike the “room” area, returning to the 5 foot, 11 inch average height of the western passageway. Some boards and a few tin cans were still found in the tunnel fill within Unit 2 but they petered out until no more major artifact inclusions were encountered beyond about three fourths of the way across the unit.

The tunnel feature ran completely across Classroom #4, up to the foundation under the dividing wall. The overburden “roof” above the tunnel gradually diminished as the tunnel came closer to the surface until, at the point where the tunnel went under the concrete foundation, there was no soil overburden or roof. Consequently the bottom of the foundation intruded into the tunnel’s roof at that point. At the precise width of the tunnel, at the point where it crossed under the dividing wall between Classrooms #4 and #3, the bottom of the concrete foundation was slightly arched. The depth of the foundation at the centerpoint of the tunnel passage was some 25 inches below the concrete floor. The depth of this foundation, which gave it enormous strength, is curious, given that it supported only a structurally insignificant secondary dividing wall between the two classrooms.

At that point it became obvious that the initial Ground Penetrating Radar survey had actually detected the tunnel at the locus of its crossing under the dividing wall. Indeed, the GPR was successful in detecting the tunnel feature on both sides of the dividing wall beneath the concrete pad floor. The two corresponding anomalies had been the reason to cut through the concrete pad floor to create Classroom #3, Unit 1 and Classroom #4, Unit 2 in the first place. And it was the reason the two units were directly aligned with each other, even though on opposite sides of a then-existing dividing wall.

An unexpected discovery was made in the tunnel directly under the foundation between Classrooms #4 and #3. Four large containers were found in situ standing upright and directly beside each other. Curiously, they were not found on the floor of the tunnel but had been placed on a de facto “platform” of fill halfway up to the arched foundation.

The four containers were comprised of two blue enameled metal cylindrical pots; one tall, cylindrical crockery pot; and one rusted cast iron cauldron. The smaller of the two metal pots had a loose, makeshift handle of twisted wire. The larger metal pot had one original looped metal handle still fixed to one of its sides. The crockery container, stamped “Red Wing Stoneware Co.”, was of a glazed tan color and had a decoration of one cobalt blue leaf and three stems painted on one side.

Further work revealed that the tunnel ran completely under the dividing wall foundation arch and eastward under Classroom #3. Digging backward and downward, it was then possible to observe a profile of the tunnel feature. The bottom of the tunnel was slightly U-shaped and clearly distinguishable from the lighter natural soil matrix below, which unlike the tunnel fill, contained some lighter and darker-colored small areas of rodent burrow disturbances.

Just 12 inches eastward of the dividing wall foundation another profile was defined. The tunnel again had a “roof” of compacted overburden soil. Therefore an inverted U-shaped soil boundary was very clearly defined both in soil color and texture at the top of the tunnel profile.

Unlike the tunnel passages in Classroom #4, there were virtually no inclusions of artifacts in the tunnel fill within Classroom #3. Following the tunnel fill, the team reencountered the area of the metal waste pipe with the shiny pipe joiner clamps previously described. Following the tunnel fill eastward down trench Unit 1, it became apparent that the original tunnel virtually coincided with the size and length of the concrete cutout for that unit. This coincidence was the reason the tunnel was not discovered in the initial excavation of Unit 1. Digging downward precisely within its margins, it had been impossible to visualize the lateral signature of the tunnel.

Summarizing the excavation under Classrooms #3 and #4, there was a clearly defined tunnel whose data conformed to virtually all of the test expectations for the discovery and identification of such a tunnel. Indeed, it had been possible to follow the orientation of the tunnel for some 22 feet in Classroom #4 and for an additional 28 feet where it went in an east/west direction across Classrooms #4 and #3. Thus the explored portion of the tunnel extended for a total of more than 50 feet.

With what little time there was left, attention was directed to Unit 3 of Classroom #3, which contained the intriguing remains of wooden posts. These were found in situ, still in upright positions. Both posts were the remains of 4 x 4″ timbers. The first one had been burnt. The second post was more intact, and only slightly burnt. Due to their relationship parallel to the east wall of the preschool and relative to wood fragments to the north in Unit 2 found earlier by Jerry Hobbs, these posts seemed to be spaced at regular intervals, extending from north to south in classroom #3. They may have been part of a shoring system for an underground passageway, but there was no longer any time to explore for corroborative evidence.

In addition to discoveries underground, there were observations within the building itself which remain unexplained. A stack of twenty or more unused, light brown asphalt tile, appearing to be exactly the same as the tile used throughout the entire interior floor of the preschool, was discovered in the cupboard under the kitchenette sink in the office (p.181). This discovery raised the question of whether or not the floor had been patched, or perhaps replaced in its entirety. Several sections of tile had been removed by the District Attorney’s investigators in 1985 but the black mastic under the tile remained on the concrete slab. In order to check the preschool floor thoroughly for any patches or replaced areas of concrete, all of the tile would have to be removed and then the mastic would have to be sandblasted or chemically removed. Because of financial and time constraints, these ideas were quickly abandoned in favor of trying to locate and identify any tunnels or rooms under the school.

Several days into the project one of the workers noticed that Classroom #3 did not have a door knob (p.182). Instead, there was a single cylinder dead bolt with a flip latch on the inside, with only a keyhole on the outside. Once latched from the inside, there could be no entry to this classroom without a key. The face of this door was obscured from outside view due to its placement within the inside corner of the L shape of the building, recessed behind the north wall of Classroom #2. The absence of any exterior knob was thus undetectable whenever the door was open, since the face of the door backed onto the deadend of the hallway.

Several parents remembered that when they were present at the school during operating hours, the door had always stood open. A mother who had occasion to visit with her two-year-old son stated that whenever she was there the toddler would run into the vacant room and reach for the children’s paint and brushes. The child did this several times and each time the director would scold the mother and tell her it was not safe to let her baby go into the room because there were too many things he could get into. Yet the door was never closed.

Conclusions

The project determined the existence of two extensive tunnel complexes beneath the concrete floor of the McMartin Preschool building. One, toward the south, was consistent with the location and function described by children; it appeared to connect the interior of the preschool with the adjoining triplex structure and it had a distinct signature where it exited under the foundation of the east wall. Since it lacked dateable artifacts and a consistent demarcation of floor profile, it was classified conservatively as a “possible” tunnel.

The feature that conforms scientifically to the predetermined attributes as a tunnel was the complex on the north. This tunnel feature was clearly distinguished from the other subsurface features encountered during our excavations at the site. The northern tunnel feature conformed to virtually all of the test expectations, as follows:

1. An identified entrance;

2. The architecture was both linear and slightly curvilinear;

3. The architecture was large enough for adult human passage;

4. There were characteristic scars indicating that it had been dug by hand;

5. The feature had a compacted dirt floor;

6. The tunnel was found not open;

7. The tunnel had been completely, artificially filled in with fill which was distinguishable on the basis of color, texture and compaction from the original soil depositat the site;

8. The fill contained inclusions in the form of a large number of artifacts;

9. The probabilistic dating of the tunnel can be estimated by recovered artifacts.

The following seven factors determine probable age. First, it is unlikely that the bright, stainless steel straps had been placed on the pipe in 1966, when the structure was built. Second, the placement of the mailbox most probably dates to the time following the destruction of the neighboring house in 1972. Third, the Disney bag has a date of 1983, which indicates that the tunnel fill dates to that time or thereafter. Fourth, the arching of the foundation precisely over the tunnel was obviously a feature made to accommodate the tunnel and there is no other conceivable scenario to account for it. Fifth, the four large containers which were placed by hand into the tunnel fill indicate the use of the tunnel after the preschool was built. Given their position under the foundation, there is no possibility that they would not have been knocked out of place and their intact glass bottle and jar contents broken when the trench was excavated in 1966 for the pouring of the concrete foundation. Sixth, the ceiling of the tunnel was simply too shallow to have withstood human foot traffic on it in an unprotected state. If the tunnel feature had existed prior to the construction of the preschool, its covering or roof would have been so shallow that a person walking on the surface would have easily caved it in, thus exposing the tunnel. Finally, the soil deposit at this part of the property had been put into place and compacted at the time of the building construction. Therefore any holes or openings found in that area extending up to or near the surface would necessarily date to a time after 1966.

Therefore, given the evidence of the seven factors above, the time of the construction and use of the tunnel postdates 1966.

Summation

This report describes the efforts of a group of parents to explore the meaning of several issues raised by their children after attending the McMartin Preschool. Reports of the existence of underground passageways had not been confirmed in the limited exploration conducted by the office of the District Attorney. At the first opportunity of private access to the preschool property, these parents secured permission from the new owner to search more extensively for pertinent information. By engaging a highly recommended professional archaeological team, they hoped to bring scientific authority to whatever might be found or a definitive resolution for whatever was not to be found.

The present project started where the earlier investigation left off, re-examining the previous digs outside the school structure, using new technology to survey for possible anomalies beneath the floor of the structure, and then actually cutting through the concrete floor and scientifically evaluating the consistency and integrity of the underlying soil.

The results of the survey by Ground Penetrating Radar proved consistent with discoveries of the subsequent excavations, all of which confirmed not only the basic descriptions of children but also specific details of location, interior features and putative function.

The McMartin Tunnel Project confirms that a functional pattern of tunnels once existed under the McMartin Preschool, that the tunnels provided access outside the walls of the structure, that they must have been constructed after the structure was built in 1966, and that they were subsequently completely repacked with extraneous soil and implanted artifacts at some time prior to May, 1990. While this project had no way of determining who dug these tunnels, or for what purpose, the discoveries stand in stark contrast to the skeptical position that the children only imagined what they described as activities underground.

If the stories of the children were bogus fantasies, there is no excuse for the tunnels discovered under the school. If there really were tunnels, there is no excuse for the glib dismissal of any and all of the complaints of the children and their parents.

References

Langenwalter, Paul E., Kevin Peter, Jane King, and Robert Beer, 1985. Report on a forensic archaelogical investigation conducted at the Goldstein property at Manhattan Beach, California. Report prepared for the Los Angeles County District Attorney. Unpublished report on file at the contracted firm of Scientific Resource Surveys, Inc., Huntington Beach, California, and at the Office of the District Attorney.

Stickel, E. Gary, 1979. More on Theory Building in Archaeology. Current Anthropology, Vol. 10, pp. 621-622.

Tags: ,